Fortune 500 Plant Building 701 Demolition
Location: Ohio
Scope of Work:
Hazardous Waste Removal, Structural Demolition, Shoring, Erosion Control, Excavation, Recycling
Project Detail:
Mass demolition of a 100,000 SF building. Preparatory work includes environmental abatement of PCB impacted windows and floor slabs. Incidental work includes construction of temporary closure walls, salvage of company emblem, utility disconnects, protection of adjacent utilities (electrical duct bank) scheduled to remain, installation of erosion control measures, shoring of noted basement walls scheduled to remain and backfill of below-grade basements with flowable fill and compacted engineered fill.