Nutone Plant Demolition
Location: Cincinnati, OH
Scope of Work:
Asbestos Abatement Structural Demolition, Excavation, Contaminated Soil Removal, Recycling
Project Detail:
Mass demolition and removal of the former Nutone Manufacturing Plant located in urban Cincinnati, OH. This project encompassed demolition of multiple office, manufacturing and warehouse buildings totaling approximately 600,000 SF. Of particular note, work included characterization, excavation, loading, hauling and disposal of approximately 7,000 tons of non-hazardous contaminated soils. All work, including this hazardous soil excavation, was performed directly overtop or adjacent to a 96” radial brick sewer without damage or incident. This project was completed on a “fast track” basis to allow immediate commencement of follow-up new construction and site redevelopment activities.