Northbank Condominiums Selective Demolition
Location: Columbus, OH
Scope of Work:
Interior Demolition, Selective Demolition, Structural Demolition
Project Detail:
This project involved selective structural demolition of an abandoned A&P Warehouse in the revitalized Arena District. The project entailed various structural removals throughout the entire building, including the selective removal of stairwells, penthouses, elevator shafts and the enlargement of the existing windows/openings. In addition one entire column bay, from the rooftop to the bottom of the footings, was removed at the south end of the building. To accomplish this work, we executed systematic demolition and sawcutting operations to assure that the structural integrity of the building was not compromised. This “open-end” was later attached to a new tower built directly adjacent to it.