University of Cincinnati Varsity Village Demolition
Location: Cincinnati, OH
Scope of Work:
Deconstruction, Selective Demolition, LEED
Project Detail:
This project included the removal of an entire floor from atop an active NCAA Division I Football team locker-room, offices and other support facilities. The work required an initial gut out of the space, the installation of a temporary roofing system, the construction of temporary weather tight walls and then the demolition of a poured in place structural floor. Work was performed while maintaining an active practice schedule and a constant weather proof environment.